Rise Gallery

/Rise Gallery/

Marlborough pl St Ives

Structural & Stormwater Pre-purchase Inspection Services

By | September 4th, 2018|Comments Off on Marlborough pl St Ives

HOWARD ave dee why

Structural Design of 8 x Storey Mixed-Use Commercial/Residential Building with Carpark Levels. Pre-cast Concrete walls with a combination of conventionally reinforced and Post-Tensioned Slab systems.

By | September 4th, 2018|Comments Off on HOWARD ave dee why

Etna st gosford

Structural Design of 4 x Storey Residential Apartment

By | September 4th, 2018|Comments Off on Etna st gosford

Rutledge Street, Eastwood

Preparation of Repair Specifications/ Drawings for out of position Façade Pre-cast Concrete Panels for a 9x Storey commercial/ residential building. Inspections and Certification of the ‘as built’.

By | September 3rd, 2018|Comments Off on Rutledge Street, Eastwood

Murray Street, Bronte

Structural Design & Documentation of a suspended concrete footpath with extensive reinforcement corrosion and concrete spalling defects.

By | September 3rd, 2018|Comments Off on Murray Street, Bronte

Darling Point Rd, Darling Point

Structural Inspections and Reports for Proposed Modifications and Relocations of the Services Room.

By | September 3rd, 2018|Comments Off on Darling Point Rd, Darling Point

zouch rd Bardia

Stormwater Drainage Design including OSD

By | September 3rd, 2018|Comments Off on zouch rd Bardia

Denison st Concord

Stormwater Drainage Design including OSD

By | September 3rd, 2018|Comments Off on Denison st Concord

Coles st concord

Stormwater Drainage Design discharge to existing 1050mm Diameter Easement Pipe

By | September 3rd, 2018|Comments Off on Coles st concord

Crown st Darlinghurst

Civil/Structural Design of Proposed additions to the existing Terrace

By | September 3rd, 2018|Comments Off on Crown st Darlinghurst